Overhead bridge cranes remain the default answer for very heavy workpieces, but their rails define a hard boundary. In older aerospace and heavy equipment plants, crane coverage often stops well short of inspection rooms, paint preparation bays and annex storage. Anything outside that boundary depends on a second handling method, and each handover between crane and floor transport adds queue time and a lift-and-set cycle that quality teams dislike.
| Element | Configuration |
|---|---|
| Mecanum wheel diameter | 14 inch (356 mm) |
| Rated load per unit | 5,000 kg |
| Operation modes | Single unit, or synchronised tandem pair for long parts |
| Top deck | Custom cradle with adjustable supports and damping options |
| Heading control | Any-angle travel, zero-radius rotation, lateral positioning |
| Safety | Multi-plane scanning, reduced-speed zones, e-stop chain |
A single vehicle handles loads that fit its deck. When the workpiece is longer than the platform, two units operate as a virtual rigid body over a shared control bus, each compensating for the other's heading error so the cradle stays square through corridor turns. This is the configuration that makes a nine-metre part practical inside a six-metre corridor, an operation that is impossible for any fixed-axle vehicle regardless of its payload rating.
Both modes are switchable in software. A shop can start with tandem handling on a single long route, then split the pair into two independent vehicles when process changes remove the oversized part from the flow, without buying new hardware.
Aerospace and heavy equipment buyers usually take a chassis plus a programme-specific cradle, with the fixture designed under ODM terms. Complete vehicles and mecanum wheel modules are equally available. Capacity spans 100 kg to 20,000 kg, and multi-unit tandem arrangements extend the practical ceiling by commissioning two or more rated platforms together.
Note: figures in this guide are platform ratings, not measured project results. Part geometry, fixture stiffness and floor condition all influence final alignment accuracy, which should be verified during commissioning.